Skip to main content

CI workflows

Every workflow under .github/workflows, grouped by what starts it. The triggers and schedules are read from the workflow files; the group, what each workflow verifies and whether its check is required for a merge come from test/ciworkflows/inventory.json. A pull request that adds, removes or renames a workflow, or changes its triggers, regenerates this page (go run ./test/ciworkflows); the lint job fails otherwise.

The last-run columns are filled by the daily report from the GitHub API; recorded 2026-11-23T08:22:17Z.

Pull request gates​

WorkflowTriggersVerifiesRequiredLast run on mainLast scheduled run
change-scope.yaml Change scopeworkflow_callReusable: reports which lanes of jobs a pull request needs (product, stack, baseline) from its changed files.nopull requests onlynot scheduled
changelog-pr.yaml Changelog PRpull_request (main; types opened, synchronize, reopened)A pull request that changes shipped code carries a CHANGELOG entry under Unreleased.nopull requests onlynot scheduled
ci.yaml CIpull_request (main)
push (main; 4 paths-ignore)
workflow_dispatch
Unit tests, race, fuzz smoke, lint, conformance gate, image, compose stacks (e2e-compat, fleet, UI), helm and docker checks.yesfailure 2026-11-22not scheduled
codeql.yaml CodeQLpull_request (main)
push (main; 4 paths-ignore)
schedule 0 6 * * 1 (weekly, Monday 06:00 UTC)
workflow_dispatch
CodeQL analysis of the Go code and the workflows, also weekly on main.yessuccess 2026-11-23success 2026-11-23
compat-drilldown.yaml Logs Drilldown Compatibilitypull_request (main)
push (main; 4 paths-ignore)
schedule 45 3 * * 1 (weekly, Monday 03:45 UTC)
workflow_dispatch
Logs Drilldown compatibility against the pinned and matrix Grafana and plugin versions.yessuccess 2026-11-23success 2026-11-23
compat-loki.yaml Loki Compatibilitypull_request (main)
push (main; 4 paths-ignore)
schedule 15 3 * * 1 (weekly, Monday 03:15 UTC)
workflow_dispatch
Loki API compatibility against the pinned Loki and the Loki version matrix.yessuccess 2026-11-23success 2026-11-23
compat-vl.yaml VictoriaLogs Compatibilitypull_request (main)
push (main; 4 paths-ignore)
schedule 15 4 * * 1 (weekly, Monday 04:15 UTC)
workflow_dispatch
Compatibility with the pinned VictoriaLogs and the supported VictoriaLogs version matrix.yessuccess 2026-11-23success 2026-11-23
e2e-pipeline.yml E2E Pipelinepull_request (main)
push (main; 4 paths-ignore)
workflow_dispatch
The end-to-end ingest pipeline stack answers through the proxy.nosuccess 2026-11-22not scheduled
perf-ab.yaml Perf A/Bpull_request (main; types opened, synchronize, reopened)Per pull request A/B smoke of the base build, the PR build and Loki over the shapes the change selects.nopull requests onlynot scheduled
pr-evidence-summary.yaml PR evidence summaryworkflow_run (CI, PR Quality Report, Perf A/B, Visual smoke, Loki Compatibility, Logs Drilldown Compatibility, VictoriaLogs Compatibility, Security PR; types completed)Summarises the evidence artifacts of a pull request's finished runs; runs no pull request code.nosuccess 2026-11-23not scheduled
pr-quality-report.yaml PR Quality Reportpull_request (main; types opened, synchronize, reopened)Base against head quality report: coverage floor, tests, query corpus, compatibility scores and tracked performance.yespull requests onlynot scheduled
release-pr-validation.yaml Release PR Validationpull_request_target (main; types opened, synchronize, reopened, edited, ready_for_review)
workflow_dispatch (inputs: pr)
The bot's release metadata and report pull requests carry only the files the bot may write.nononenot scheduled
security-pr.yaml Security PRpull_request (main)
push (main; 4 paths-ignore)
workflow_dispatch
Static security checks and the runtime security smoke of the pull request build.yessuccess 2026-11-22not scheduled
visual-smoke.yaml Visual smokepull_request (main; types opened, synchronize, reopened, labeled, unlabeled)Grafana Explore and Logs Drilldown screenshots of the base build, the PR build and Loki for the pages the change touches.nopull requests onlynot scheduled

Main push​

WorkflowTriggersVerifiesRequiredLast run on mainLast scheduled run
docs-site.yaml docs-sitepull_request (4 paths)
push (main; 4 paths)
workflow_dispatch
Builds the documentation site on pull requests that touch it and deploys it from main.nosuccess 2026-11-22not scheduled

Daily​

WorkflowTriggersVerifiesRequiredLast run on mainLast scheduled run
daily-report.yaml Daily reportpull_request (main; 12 paths)
schedule 7 8 * * * (daily 08:07 UTC)
workflow_dispatch
Daily on main, on fresh stacks: every executable registry case against Loki on VictoriaLogs v1.49.0 and the pin, the Loki error answers asked again and replayed, a parity slice, the perf smoke, the proxy's cache reuse on every case and shape, and the scheduled workflows' health; one summary and one rolling report pull request.nofailure 2026-11-22failure 2026-11-22
query-corpus.yaml Query Corpuspush (main)
schedule 23 2 * * * (daily 02:23 UTC)
workflow_dispatch
Builds the query corpus of main and re-verifies the recorded Loki and VictoriaLogs answers, differentials and the grammar sweep with the live oracles.nofailure 2026-11-23failure 2026-11-23
security-heavy.yaml Security Heavyschedule 0 4 * * * (daily 04:00 UTC), 0 6 * * 1 (weekly, Monday 06:00 UTC)
workflow_dispatch
Image and SBOM scan, semgrep, long fuzzing and the DAST scan of a running proxy.nofailure 2026-11-23failure 2026-11-23

Weekly​

WorkflowTriggersVerifiesRequiredLast run on mainLast scheduled run
error-answers-record.yaml Error answers re-recordpull_request (main; 4 paths)
schedule 37 5 * * 3 (weekly, Wednesday 05:37 UTC)
workflow_dispatch
Asks the pinned Loki the recorded error requests again and fails when an answer changed.nofailure 2026-11-18failure 2026-11-18
parity-refresh.yaml Parity refreshpull_request (main; 6 paths)
schedule 43 13 * * 6 (weekly, Saturday 13:43 UTC)
workflow_dispatch
Differential run of the proxy against Loki over the whole corpus on a fresh stack; opens the rolling parity report pull request.nofailure 2026-11-21failure 2026-11-21
perf-daily.yaml Perf weeklypull_request (main; 11 paths)
schedule 17 3 * * 1 (weekly, Monday 03:17 UTC)
workflow_dispatch (inputs: max_range, runs, sets)
Full A/B run of the last release, main and Loki over every shape set and range, and the weekly full run on VictoriaLogs v1.49.0 and the pin: per-case verdicts, the whole parity corpus, the full-size grammar sweep, the A/B on v1.49.0, the fleet cache proof, the cache reuse of every shape and a release.yaml dry run; opens the rolling performance report pull request with the weekly trend.nofailure 2026-11-23failure 2026-11-23
scorecard.yaml Scorecardpush (main)
schedule 37 5 * * 1 (weekly, Monday 05:37 UTC)
workflow_dispatch
Publishes the OpenSSF Scorecard result of main.nosuccess 2026-11-23success 2026-11-23

Release​

WorkflowTriggersVerifiesRequiredLast run on mainLast scheduled run
auto-release.yaml Auto Releasepush (main)
workflow_dispatch
On every push to main: decides from the changelog whether a release is due, validates, tags, builds, signs and publishes it, and refreshes the release metadata pull request.nosuccess 2026-11-22not scheduled
release.yaml Releaseworkflow_dispatch (inputs: dry_run, tag)Manual republish of a release tag: binaries, SBOMs, provenance, signatures, images (GHCR and Docker Hub), Helm chart and release assets.nosuccess 2026-11-23not scheduled

Maintenance​

WorkflowTriggersVerifiesRequiredLast run on mainLast scheduled run
cancel-conflicted-pr-runs.yaml Cancel conflicted PR runspush (main)
workflow_dispatch
After a push to main, cancels the pull request runs of open pull requests that now conflict with main.nosuccess 2026-11-22not scheduled
ghcr-badges.yaml Pull Count Badgespush (main)
schedule 15 */4 * * * (every 4 hours at :15)
workflow_run (Release; types completed)
Refreshes the container pull count badges.nosuccess 2026-11-23success 2026-11-23
loc-badges.yaml LOC Badgespush (main; 1 paths)Refreshes the lines-of-code badges.nosuccess 2026-11-22not scheduled
pr-labeler.yaml PR Labelerpull_request (types opened, synchronize)Labels pull requests from their changed paths.nopull requests onlynot scheduled
visual-smoke-cleanup.yaml Visual smoke cleanuppull_request (main; types closed)
schedule 41 4 * * 1 (weekly, Monday 04:41 UTC)
workflow_dispatch
Removes the visual proof montages of closed pull requests.nosuccess 2026-11-23success 2026-11-23